2-09.3(1)C Removal of Unstable Base Material
(PUD July 2020)
The first sentence of the second paragraph is revised to read:
Gravel backfill for replacement of unstable base material shall meet the requirements of Section 9-03.9(1) or 9-03.12 as directed by the Engineer.
2-09.3(1)D Disposal of Excavated Material
(PUD July 2020)
The second paragraph is revised to read:
All costs associated with disposing of excavated material shall be a necessary part of the Work and included in the unit contract price for the structure.
2-09.3(1)E Backfilling
(PUD July 2020)
The first paragraph is revised to read:
All costs associated with furnishing and installing backfill material of openings dug for structures and potholing shall be a necessary part of the Work and included in the unit contract price for the structure.
Backfill materials and compaction shall conform to the Plans, PUD Standard Drawings, and Agency utility permits when in right of way, whichever is more restrictive.
2-09.4 Measurement
(PUD July 2020)
Section 2-09.4 is supplemented with the following:
There shall be no measurement for structure excavation. Compensation for structure excavation, hauling and disposal of excavated material, and for backfilling shall be included in the payment for the various items for which the excavation is done.
2-09.5 Payment
(PUD July 2020)
Section 2-09.5 is deleted in its entirety and replaced with the following:
No separate payment will be made for structure excavation, haul, disposal of structure excavation, or backfilling for pipes or structures.