3.2 Distribution System Extensions to Support Development

Developing properties must extend utility lines to the site, across the property frontage, and through the property to allow connection and provide for future extensions for the development of adjacent parcels. Additional offsite work may be required to provide a looped water main for water quality, fire protection, or system redundancy purposes. Any existing water main that is substandard in size or material shall be replaced. Proposed water line sizes and alignments must be designed in accordance with the latest Water System Plan, or as determined by the PUD staff for overall system development and network extension.