These rules include various requirements applicable to the Utility, the applicant, the Interconnection Customer and the Generating Facility.
These rules modify, if necessary, any existing interconnection rules of the Utility, including but not limited to, rules implementing Section 80.60 RCW, Net Metering of Electricity.
These rules do not apply to interconnection of standby or backup generators that are not intended to operate in parallel with the Utility’s system. Such interconnections will be negotiated on a case-by-case basis with the Utility and such generators will only be interconnected on terms and conditions prescribed by the Utility.