- Submit application, Agreements and Application Fee to Skamania PUD:
- Completed and signed Net Metering Interconnection Application and Agreement
- Signed Net Metering Interconnection Agreement
- Electrical schematic drawing
- Site plan with proposed meter location(s)
- Provisions for a Visible-break Lockable Disconnect, if required
- Manufacturer cut sheets (solar panels, inverters, etc.)
- Non-refundable application fee: Tier 1 - $200 Tier 2 - $200 + $10 per kW over 25 kW (maximum of $950)
- Send the above listed documents to: