2-09 Structure Excavation

2-09.3(1)C Removal of Unstable Base Material

(PUD July 2020)

The first sentence of the second paragraph is revised to read:

Gravel backfill for replacement of unstable base material shall meet the requirements of Section 9-03.9(1) or 9-03.12 as directed by the Engineer.

2-09.3(1)D Disposal of Excavated Material

(PUD July 2020)

The second paragraph is revised to read:

All costs associated with disposing of excavated material shall be a necessary part of the Work and included in the unit contract price for the structure.

2-09.3(1)E Backfilling

(PUD July 2020)

The first paragraph is revised to read:

All costs associated with furnishing and installing backfill material of openings dug for structures and potholing shall be a necessary part of the Work and included in the unit contract price for the structure.

Backfill materials and compaction shall conform to the Plans, PUD Standard Drawings, and Agency utility permits when in right of way, whichever is more restrictive.

2-09.4 Measurement

(PUD July 2020)

Section 2-09.4 is supplemented with the following:

There shall be no measurement for structure excavation. Compensation for structure excavation, hauling and disposal of excavated material, and for backfilling shall be included in the payment for the various items for which the excavation is done.

2-09.5 Payment

(PUD July 2020)

Section 2-09.5 is deleted in its entirety and replaced with the following:

No separate payment will be made for structure excavation, haul, disposal of structure excavation, or backfilling for pipes or structures.

2-03 Roadway Excavation & Embankment

2-03.3(7)C Contractor-Provided Disposal Site

(PUD July 2020)

Replace the first paragraph with:

The Contracting Agency has not provided a waste site for the disposal of excess materials and debris. The Contractor shall arrange for disposal of excess excavation or other materials at no expense to the Contracting Agency.

2-02 Removal of Structures & Obstructions

2-02.1 Description

(PUD July 2020)

Section 2-02.1 is supplemented with the following:

This Work also includes removing and disposing of, or salvaging, existing vaults, and other structures as shown on the Plans. The Work also includes the backfilling of trenches, holes, or pits that result from such removal.2-02.5 Payment
(PUD July 2020)

Section 2-02.5 is supplemented with the following:

“Removal of _______”, each.

The unit Contract price per each for removal of structures of the kind specified shall be full pay for all costs in connection with removing, disposing of, or salvaging the materials as shown on the Plans, and backfilling of trenches, holes, or pits that result from such removal.