Division 8

8-02 Roadside Restoration

8-02.1 Description

(PUD April 2020)

Section 8-02.1 is supplemented as follows:

This Work consists of in-kind restoration of all disturbed areas between the edge of pavement or curb, and the limits of construction.

8-02.4 Measurement

(PUD April 2020)

Supplement this section with the following:

When the Bid Proposal contains the item “Roadside Restoration” there will be no measurement of unit items for Work defined in Section 8-02.

No specific unit of measurement will apply to the lump sum item of “Roadside Restoration.”

8-02.5 Payment

(PUD April 2020)

Supplement this section with the following:

“Roadside Restoration”, lump sum.

The lump sum Contract payment shall be full compensation for all costs incurred by the Contractor in performing the Contract Work defined in Section 8-02.

8-01 Erosion Control & Water Pollution Control

8-01.4 Measurement

(PUD April 2020)

Supplement this section with the following:

No specific unit of measurement will apply to the lump sum item of “Erosion Control and Water Pollution Control”.

8-01.5 Payment

(PUD April 2020)

Supplement this section with the following:

“Erosion Control and Water Pollution Control”, lump sum.

The lump sum Contract payment shall be full compensation for maintenance and removal of erosion and water pollution control devices including removal and disposal of sediment, stabilization and rehabilitation of soil disturbed by these activities, and any additional Work deemed necessary by the Engineer to control erosion and water pollution.